Project: Kraftwerk Hamm-Uentrop, Deutschland
Investor: Wiemer&Trachte AG, Siemens AG
Works: Repair of moisture in the basement section of the object
State of the structure: Existing damage to the structure were within the zone of dilation of the walls, near built-in tubular inlets, with water-permeable cracks and dysfunctional injection protections between wall and floor.
The process of restoration: Based on our diagnostics, wall dilatations were injected with Euras Gel type B to achieve a homogeneous sealer in the dilatation. The same material was used for supplement filling of zone along the injection hose system failure, as well as filling defects in the part of the pipe inlet. Everything was done to the appearance of the gel to control wells, which indicates full occupancy of the zone and groundwater elimination.
More than 2000 kg of Euras Gel was built in and existing leaking was permanently eliminated.